349 State Ln, Orlando, FL 32801Serving contractors across Florida

All services

MEP Estimating Services in Florida

Seventeen estimating services that cover a project from the first budget to the last change order, for mechanical, electrical, plumbing and fire protection scopes.

Free quote

Send plans. Get a firm quote.

24–48 hr typical turnaround

NDA-protected plans

Florida Building Code aware

Florida labor & material pricing

Overview

Pick the service that fits where your project is

Early in design, owners and architects need a preliminary MEP budget and value engineering. At bid time, contractors need a full bid estimate or a quantity takeoff they can price themselves. After award, purchasing needs a material takeoff, and project managers need change order pricing.

Every service uses the same approach: count and measure everything on the drawings, price it to Florida labor and material costs, and show the work on marked-up drawings so your team can check it.

Estimators analyzing project documents at a table

Services

By project type

Residential MEP Estimating

Single-family, townhome, multifamily and condo MEP takeoffs priced for Florida builders.

Commercial MEP Estimating

Offices, retail, restaurants, hotels, schools and healthcare MEP bids.

Industrial MEP Estimating

Plants, warehouses, cold storage and process facilities with heavy MEP scopes.

Renovation & Tenant Improvement Estimating

Demo, reuse and new MEP pricing for remodels, buildouts and TI work.

Storm Damage & Insurance Estimating

Line-item MEP repair estimates for hurricane, flood and wind claims.

Services

Takeoffs & documents

MEP Quantity Takeoff

Counted and measured MEP quantities, marked up so you can check every line.

MEP Material Takeoff

Purchase-ready material lists by system, floor and phase for buying and release.

Bill of Quantities (BOQ)

Structured MEP BOQs in CSI format for tendering, bid comparison and payment.

MEP Shop Drawings Estimating

Takeoffs from coordinated shop drawings and BIM models for detailed buyout.

Services

Bidding & cost control

MEP Bid Estimating

Full priced MEP bids with labor, material, equipment, markups and exclusions.

Preliminary & Conceptual Estimating

Early MEP budgets from schematic or DD drawings so owners can make go/no-go calls.

MEP Value Engineering

Priced alternates that cut MEP cost without breaking code or performance.

Change Order Estimating

Documented add/deduct pricing for MEP changes, bulletins and field directives.

Bid Review & Leveling

Scope-checked comparisons of MEP subcontractor bids so you award the right number.

MEP Estimating Outsourcing

An extra MEP estimating desk for contractors who bid more work than they can price.

Services

Engineering calculations

Electrical Load Calculation

NEC-based service and feeder load calculations for permits and design checks.

HVAC Load Calculation

Manual J and commercial cooling load calcs sized for Florida heat and humidity.

Our process

How our MEP estimating process works

  1. 01

    Send your plans

    Upload PDFs, CAD files or a bid-portal link with specs, addenda and the bid date. A quick scope note helps.

  2. 02

    Get a fixed quote

    We confirm scope, price and delivery date before any work starts. No surprises on the invoice.

  3. 03

    Takeoff & pricing

    Estimators count and measure every MEP item, then price labor and material for the project's Florida location.

  4. 04

    Senior QA review

    A second estimator checks quantities, scope gaps and math against the drawings and specs.

  5. 05

    Bid-ready delivery

    You get the Excel estimate, marked-up drawings and a clarifications list you can send with your bid.

FAQs

Frequently asked questions

Straight answers to what contractors usually ask before sending plans. Don’t see your question? Call or email us.

Talk to an estimator

If you want a complete price, choose MEP bid estimating. If you have your own pricing, a quantity takeoff is usually enough.

Yes. Many clients order a bid estimate with a material takeoff, or a preliminary estimate followed by VE.

Yes. Owners use our preliminary estimates, BOQs, bid leveling and change order reviews.

They’re separate services, but they can be ordered together with an estimate.

Have plans on your desk? Get your MEP number before the bid date.

Send the drawings today and we will confirm price and delivery before any work starts.

Start here

Get a free MEP estimating quote

Upload your drawings and tell us what you need. We review the plans, confirm scope and send a price and delivery date. Your files stay confidential.

Scroll to Top