349 State Ln, Orlando, FL 32801Serving contractors across Florida

Frequently asked questions

MEP Estimating FAQs

Answers to the questions Florida contractors, owners and design teams ask most about our MEP estimating services.

Free quote

Send plans. Get a firm quote.

Part 1

General questions

An MEP estimator reviews mechanical, electrical and plumbing drawings and specifications, counts and measures every component, and prices the labor, material and equipment needed to install them.

General contractors, MEP subcontractors, developers, owners, architects, engineers, suppliers and restoration contractors working on Florida projects.

Yes. Focusing on Florida keeps our labor pricing, material costs and code knowledge specific and current.

Mechanical, HVAC, ductwork, piping, process piping, insulation, controls, equipment, electrical, lighting, low voltage, fire alarm, generators, solar PV, plumbing, medical gas, site utilities, fire sprinklers and fireproofing. See all trades.

Yes, from single homes to production subdivisions, multifamily and condo towers. See residential MEP estimating.

Part 2

Turnaround, pricing and delivery

Most single-trade and small to mid-size estimates are delivered in 24 to 48 hours. Larger projects receive a confirmed delivery date before work starts.

It depends on size, trades and detail. We send a free fixed quote after reviewing your plans. See pricing.

An editable Excel estimate, color-coded marked-up drawings, and a list of clarifications, assumptions and exclusions.

Often, yes. Tell us the bid date and we’ll say honestly whether we can meet it.

Yes. Send addenda as they’re issued. We confirm upfront whether the update is included or quoted.

Part 3

Plans, files and process

PDF drawings are preferred. We also accept CAD, Revit/IFC models and links to bid portals or cloud folders.

For residential and simple commercial work, yes. We lay out a code-based system from the architectural plans and list our assumptions.

Yes. We set up your rates, burden, markups and standard exclusions.

Every estimate gets a second-estimator review of quantities, scope and math before delivery.

Yes. We never share plans or pricing, and we sign NDAs on request.

Part 4

Florida-specific questions

The edition that applies to your permit. The 8th Edition (2023) applies to permits before December 31, 2026; the 9th Edition (2026), with the 2023 NEC, applies on and after that date.

Yes, including rooftop equipment anchorage, High-Velocity Hurricane Zone items in Miami-Dade and Broward, and wind-rated supports.

Yes. Where drawings or flood data require it, we price raised equipment, panels and platforms.

Yes. Florida has no statewide prevailing wage law, but federally funded projects follow Davis-Bacon wage decisions, and we price to them.

Still have a question?

Call 1 (816) 683-1595 or send your plans for a free quote.

Start here

Get a free MEP estimating quote

Upload your drawings and tell us what you need. We review the plans, confirm scope and send a price and delivery date. Your files stay confidential.

Scroll to Top