349 State Ln, Orlando, FL 32801Serving contractors across Florida

MEP estimating service

MEP Bill of Quantities (BOQ) Preparation

Structured, CSI-organized bills of quantities for mechanical, electrical, plumbing and fire protection, built for tendering, apples-to-apples bid comparison and progress payments.

Free quote

Send plans. Get a firm quote.

24–48 hr typical turnaround

NDA-protected plans

Florida Building Code aware

Florida labor & material pricing

Overview

One document every bidder prices the same way

When five subcontractors price MEP their own way, comparing bids becomes guesswork. One includes the generator, one excludes it. One carries the fire alarm, another assumes it’s by others. A bill of quantities fixes that. Every bidder prices the same items, units and quantities, so you compare numbers instead of interpreting them.

We prepare MEP BOQs for owners, developers, construction managers and general contractors. Each BOQ is organized by CSI division and system, with clear item descriptions, units and quantities taken from the drawings and specs. We can deliver it unpriced for tendering, or priced as an engineer’s estimate you can measure bids against.

After award, the same BOQ becomes the backbone of your schedule of values and payment applications, which makes monthly progress billing far easier to check.

Estimators analyzing project documents at a table

BOQ contents

What goes into our MEP BOQs

Construction team meeting on site

Florida factors

How a BOQ helps on Florida projects

Florida’s construction market moves fast and bidder pools change from county to county. On public and institutional work, a clear BOQ cuts bid protests and post-award disputes because everyone priced the same scope. On private work, it gives developers and lenders a cleaner view of MEP cost before they commit.

BOQs are also useful on storm-recovery and phased renovation projects, where scope gets added in stages. Unit rates from the original BOQ give you a fair basis for pricing extra work without starting from scratch.

At a glance

BOQ options

TypePrepared forTypical use
Unpriced BOQOwners, CMs, GCsTendering MEP packages to multiple bidders
Priced BOQ (engineer’s estimate)Owners and lendersBudget validation and bid evaluation
Schedule of valuesContractorsPay applications and progress billing
Variation BOQOwners and contractorsPricing scope changes from agreed rates

Scope gaps we catch

BOQ problems that lead to bid disputes

A bill of quantities only works if bidders read every line the same way. We avoid the problems that cause disputes after award.

Our process

How our MEP estimating process works

  1. 01

    Send your plans

    Upload PDFs, CAD files or a bid-portal link with specs, addenda and the bid date. A quick scope note helps.

  2. 02

    Get a fixed quote

    We confirm scope, price and delivery date before any work starts. No surprises on the invoice.

  3. 03

    Takeoff & pricing

    Estimators count and measure every MEP item, then price labor and material for the project's Florida location.

  4. 04

    Senior QA review

    A second estimator checks quantities, scope gaps and math against the drawings and specs.

  5. 05

    Bid-ready delivery

    You get the Excel estimate, marked-up drawings and a clarifications list you can send with your bid.

FAQs

Frequently asked questions

Straight answers to what contractors usually ask before sending plans. Don’t see your question? Call or email us.

Talk to an estimator

A quantity takeoff is a working document for an estimator. A BOQ is a formal, structured document with item descriptions, units and quantities that multiple bidders price the same way.

Yes. If your organization or lender has a required format, send it and we’ll build the BOQ inside it.

Yes. We note how each item was measured, for example duct by surface area or weight and pipe by linear foot, so bidders price on the same basis.

Yes. A priced BOQ acts as an engineer’s estimate you can use to evaluate bids and spot outliers.

Yes. GCs often issue an MEP BOQ to subs so the bid leveling step is faster and fairer.

Turnaround depends on project size and how complete the drawings are. We confirm the delivery date before starting.

Have plans on your desk? Get your MEP number before the bid date.

Send the drawings today and we will confirm price and delivery before any work starts.

Start here

Get a free MEP estimating quote

Upload your drawings and tell us what you need. We review the plans, confirm scope and send a price and delivery date. Your files stay confidential.

Scroll to Top